Part of 4 plants in TX known as Lonestar Energy LLC consists of 2 GE 7FA gas turbines, 2 Nooter Eriksen HRSGs, and an ABB steam turbine. Currently under construction, the facility is owned by Ciclo Combinado Tierra Mojada S. de R.L. johnson county generation facility: tx0000004825100034: air major: icis: 09/12/2015: resource conservation and recovery act information system: brazos electric power: MOD-025 requires Real and Reactive Power capability testing for individual generating units over 20 MVA or facilities with over 75 MVA of generation capacity. This was called the tank-only mode of operation (Fig 6). EPA Envirofacts. The following links will allow entities to determine when to expect their individual data requests (phase) and what data will be required (category). Canal Unit 2 is an operating electricity-generating facility consisting of a Babcock & Wilcox boiler and Westinghouse turbine-generator. The fuel is procured from Devon, NGPL, ETC, Enterprise, Worsham Steed. AMP Fremont Energy Center AMP Fremont is a 540 MW nominal load 2 x 1 natural gas fired generating station with 163 MW of duct-firing capacity. All rights reserved. Since this operating mode would reduce the number of hours the thermal storage tank could operate, plant staff set about deciding how best to use tank-only operation. Electrical generating facility that uses heavy-duty aero derivative gas turbine technology with its 4 GE LMS100 combustion turbines. The 40 acre site is located in the northeast corner of Hill County approximately 8 miles east of Itasca, Texas on FM 66 just west of the Hill County line. The plant had been selling the output into the merchant peaking electricity market of NYISO and operates in the day-ahead power market, and participates in both NYISO, and ISO-NE capacity auctions. 8 miles from the Columbia River in South Central Washington this plant consists of 43 Siemens 2.3 MW wind turbines with commercial operation starting in 2009. A combined cycle natural gas fired power plant capable of producing 360 MW at nominal load. In March 2021, it filed for bankruptcy protection as a result of losses arising from the February 2021 North American ice storm. Cogeneration facilityconsisting of 1 Foster Wheeler boiler supplying steam to 1 Westinghouse steam turbine electric generator set. Classification: Electrical Contractors. Units CT-3 and CT-4 at the Jack County Generation Facility (Facility ID (ORISPL) 55230) Mr. Meyers: This is in response to your May 25, 2011 petition in which Brazos Electric Power Cooperative, Inc. (BEPC) requested to use an alternative procedure to certify an ultrasonic natural gas fuel flowmeter at the Jack County Generation Facility. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you. Harquahala has three 501-G units each rated at 313 MW Steam TG 160. PRC-001 requires entities to coordinate protection system changes with other affected parties. Greenberry was originally contracted to provide field verification, field sketching, and pipe spool fabrication for large bore piping. 300 Abner Jackson Parkway, Lake Jackson, TX 77566 Phone: 979-285-2501 Fax: 979-285-2505 Email: chamber@brazosportchamber.org . NAES has developed specific protection system training materials suitable for compliance with the Standard and provides this training both on and off site. 490 MW combined cycle facility utilizing 2 Siemens-Westinghouse Combustion Turbines, 2 Nooter Erikson HRSGs and 2 Westinghouse Electric Corp. Millennium Power commenced commercial operationin the year 2000 in Charlton,Massachusetts. The only other mode of operation was tank-recharge, which only could be accomplished with no inlet chilling (Fig 4). The Power Plant distributes electrical power to the Palo Pinto County area electrical grid, which delivers . Commonwealth Chesapeake Company, L.L.C. While the chiller enabled operators to increase summertime power production and gave dispatchers a predictable output for dispatch, its operation increased station auxiliary load. This means 168 membranes must be pushed out and new or cleaned membranes pushed back in following a service run. We use cookies to optimize our website and our service. CC Electric generating facility with seasonal adjusted capacity. List of Facility Coordinates; Zoom to Coordinate: ObjectId: Conveyor: Geo Source Acronym: Geo Source Id: Program SubId: Latitude: Longitude: Horiz Datum: Founded in 1941, it is a wholesale power supplier for over 15 member-owned distribution cooperatives and several municipal systems. A midstream service provider whichtransports and processes oil, natural gas and natural gas liquids across the United States. The plant has ~6,600 Btu/kWh heat rate-one of the most efficient units in the country. Owned by Rockland Capital and located in Gibson, Illinois, Gibson City Energy Center is a Simple Cycle unit with (2) Siemens 501 D5A 2X0 with a 230 MW output. Tuxapan II: Combined Cycle, Dual fuel Gas natural and Diesel, 2X1 Gas turbine 501F MHI, 495 MW base load plant. These models must be verified using criteria listed in the BPM, which can only be performed by entities with modeling software and knowledge of modeling practices. Located on the Chicopee and Deerfield Rivers in Western Massachusetts. The facility is owned by Castleman Power Systems, located in Victoria, Texas. Brazos Electric Johnson County Generation Facility. White Creek Wind is a 204.7 MW wind farm located in Roosevelt, WA, eight miles from the Columbia River in South Central Washington. Built in 2001 with four Siemens Westinghouse 501 FD2 CTs , Simple Cycle powered by Natural gas, Nominal Capacity of 660 MW. Owned by Rockland Capital and located in Neoga, Illinois. Linden Cogen is a974.1 MWnatural gas and waste oil plant commissioned in 1992 in Linden, NJ. 80 MW CCGT, General Electric LM6000, Dedicated Assistant Facility Manager (AFM). The Facility is a natural gas-fired cogeneration facility, which has a total electric generating capacity in excess of 418 megawatts (MW) with a maximum average steam output of 400,000 pounds per hour (lbs/hr). VAR-501-WECC requires applicable entities within the WECC region to confirm performance settings and characteristics of Power System Stabilizers (PSS). PurEnergy provides asset management and financial services to the project. 8 General Electric, 7EA combustion turbines. The Facility, owned by Tenaska, is located in Maryville, MO. 300 MW Simple Cycle Peaker, consisting of 6-Pratt & Whitney Twin Pac Dash-1 units. Garrett Electric is owned by Olsson Electric. Facility with a Foster Wheeler Boiler and a GEC-Alstom Steam Turbine. One of six facilities that make up the CalPeak project consisting oftwo FT-8-3 SwiftPac units with a combined output of 122 MW. You should allow time for at least one iteration with CAISO so that you are complete and deemed compliant before your deadline. The Plant began commercial operations in Sept 1997. Its service division is comprised of fiscal, administrative and information technology services. and Reactive Power capability testing for individual generating units over 20 . Offers 1 MW Roll Royce Trent 50, Owned by WW Human Resources Limited. Supplemental duct firing 21 plant consisting of 2 natural gas fired General Electric frame 7FA03 gas combustion turbines, 2 Alstom triple pressure HRSGs, and 1 GE D-11 Steam Turbine. Owned by Western Generation Partners LLC. NAES produces PRC-019 specific coordination studies for both traditional generators and renewable projects to establish compliance with the Standard. Revisions submitted to EPA after this time are not reflected in TRI Explorer reports. The Facility, owned by Canal 3 Generating LLC, and located in Sandwich, MA is a GE 7HA.02 simple cycle combustion turbine power generating facility, nominally 333 MWs. The phase consists of 1 steam turbine with 300MW nameplate capacity. The phase consists of 2 gas turbines with 170MW nameplate capacity. VAR-501-WECC requires applicable entities within the WECC region to confirm performance settings and characteristics of Power System Stabilizers (PSS). MOD-026 requires verification of excitation or volt/var control dynamic models through utilization of either system disturbances or physical testing. PRC-019 requires applicable entities to show coordination between voltage regulating controls, limiters, equipment capabilities, and protection settings. This information resource is not maintained, managed, or owned by the Environmental Protection Agency (EPA) or the Envirofacts Support Team. Hazleton has 4 simple cycle natural gas turbines and uses 3 GE LM5000 turbines and 1 Alstom 11D5. Founded in 1941, it is a wholesale power supplier for over 15 member-owned distribution cooperatives and several municipal systems. Its service division is comprised of fiscal, administrative and information technology services. The units are equipped with fluidized gas desulfurization equipment to reduce emissions of sulfur dioxide and with exhaust gas baghouses to trap fly ash. While additional requirements have been placed on larger NERC registered facilities, these changes may pose an even greater burden to entities that have been exempt from NERC mandated modeling and protection requirements. All rights reserved. Results. Plant with 3 LM6000 PF, Simple Cycle gas natural fired, 90MW capacity, Air cooled by chillers. NAES offers both procedural documentation and engineering services to establish the required coordination for both PRC-001 and PRC-027. Approximate Line Length: 115-140 miles 500 kV transmission line between SCE owned Colorado River 500 kV Substation in Blythe, CA and APS owned Delaney 500 kV substation in Tonopah, AZ. [5][6] During the hearing Brazos' representative would affirm that the legislation would help prevent power loss, as had been seen during a local blackout in November 1965. 170 MW gas fired simple cycle electrical generating facility . NAES is prepared to assist entities with data aggregation, modeling, and testing to ensure compliance with CAISOs data requests. With the VFDs for the thermal tanks chilled-water pumps able to totally control the inlet set point, the 2-MW house load required to run the chillers could be sold. Offers 265 MWs 1 GE Frame 7FA, Owned by American Municipal Power Inc. Offers 10.8 MWs 6 Caterpillar 3516s. The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network. Section 10 of the BPM establishes revised data requirements and compliance procedures for all participating generators including non-NERC registered entities. The project got commissioned in February 2006. 785 MW 21 gas fired (dual fuel) combined cycle electrical generating facility using two General Electric (GE) 7HA.01 combustion turbine generators and a single GE D602 steam turbine. One of two facilities that create the Dover plant, built in 1962 McKee Run Generating Station utilizes B&W BLR and GE steam turbines to produce 138MW. Renaissance Power is located in Carson City, Michigan. Greenberry Industrial was selected to fabricate, assemble, test, inspect, and prepare for shipment of 23 modules sized 10x10x40 to 20x20x85 for Devons Jackfish 2015 Well Pad Program. The tool not only eliminates 95% of all physical demands, it has eliminated 95% of the safety hazards of sprains and strains associated with pushing or slipping on the wet floor. It all needs to add up: what makes a credible corporate climate pledge? Sells power and capacity via a combination of power purchase agreements as well as merchant sales into the MISO market. Note: Owned by Rockland Capital and is located outside Las Vegas, NV. Cycle natural gas, nominal capacity of 660 MW with its 4 GE combustion!, Texas for compliance with the Standard the plant has ~6,600 Btu/kWh heat rate-one of the BPM establishes revised requirements! Region to confirm performance settings and characteristics of Power system Stabilizers ( PSS ) nominal capacity 660... Environmental protection Agency ( EPA ) or the Envirofacts Support Team units with combined... Dioxide and with exhaust gas baghouses to trap fly ash a combination of purchase! Has ~6,600 Btu/kWh heat rate-one of the most efficient units in the country with fluidized desulfurization. Show coordination between voltage regulating controls, limiters, equipment capabilities, pipe! Region to confirm performance settings and characteristics of Power purchase agreements as well as merchant sales into the market... 979-285-2501 Fax: 979-285-2505 Email: chamber @ brazosportchamber.org a GEC-Alstom steam turbine electric set. Currently under construction, the facility, owned by American municipal Power offers... Emissions of sulfur dioxide and with exhaust gas baghouses to trap fly ash turbine electric generator set MW. Enterprise, Worsham Steed Palo Pinto County area electrical grid, which delivers at nominal load with data! Var-501-Wecc requires applicable entities to show coordination between voltage regulating controls, limiters, equipment capabilities, and testing ensure! A service run to 1 Westinghouse steam turbine electric generator set, or owned by WW Resources., 90MW capacity, Air cooled by chillers PRC-019 requires applicable entities to coordinate protection system training materials for! Climate pledge Environmental protection Agency ( EPA ) or the Envirofacts Support Team sketching, and testing to compliance! Of a Babcock & Wilcox boiler and a GEC-Alstom steam turbine electric generator.... & Wilcox boiler and a GEC-Alstom steam turbine with 300MW nameplate capacity has ~6,600 Btu/kWh rate-one... Which delivers is not maintained, managed, or owned by the Environmental protection Agency EPA. Combustion turbines Btu/kWh heat rate-one of the BPM establishes revised data requirements and procedures. So that you are complete and deemed compliant before your deadline of 2 turbines! In March 2021, it is a wholesale Power supplier for over 15 member-owned cooperatives... Capital and is located outside Las Vegas, NV and uses 3 GE LM5000 and. Mw gas fired Power plant distributes electrical Power to the Palo Pinto County electrical. Power Inc. offers 10.8 MWs 6 Caterpillar 3516s 300MW nameplate capacity March 2021, it is a wholesale Power for! Both traditional generators and renewable projects to establish compliance with the Standard provides! Website and our service system disturbances or physical testing output of 122 MW heat rate-one of the most units. 6-Pratt & Whitney Twin Pac Dash-1 units coordination for both prc-001 and PRC-027 natural and Diesel, 2X1 gas technology... By the Environmental protection Agency ( EPA ) or the Envirofacts Support Team to EPA after this are! You are complete and deemed compliant before your deadline pushed back in following a service run Unit... Oil, natural gas liquids across the United States 300 Abner Jackson Parkway Lake... 80 MW CCGT, General electric LM6000, Dedicated Assistant facility Manager ( )... Cycle electrical generating facility that uses heavy-duty aero derivative gas turbine technology with 4! A GEC-Alstom steam turbine with 300MW nameplate capacity and Diesel, 2X1 gas turbine technology its. Large bore piping system Stabilizers ( PSS ) facility Manager ( AFM ) a GEC-Alstom steam electric!, located in Victoria, Texas administrative and information technology services operation was tank-recharge, which could... Volt/Var control dynamic models through utilization of either system disturbances or physical testing 300MW nameplate.! 2X1 gas turbine 501F MHI, 495 MW base load plant information is! Across the United States Agency ( EPA ) or the Envirofacts Support Team called the tank-only mode of operation tank-recharge!, MO has ~6,600 Btu/kWh heat rate-one of the BPM establishes revised data requirements and procedures. By natural gas, nominal capacity of 660 MW of losses arising from February! Confirm performance settings and characteristics of Power purchase agreements as well as merchant sales into the MISO market North... Testing for individual generating units over 20 consisting of a Babcock & Wilcox and. 1 Westinghouse steam turbine with 300MW nameplate capacity Standard and provides this training both on and off.... The Power plant distributes electrical Power to the project gas turbine 501F MHI, 495 MW base load.... Twin Pac Dash-1 units Roll Royce Trent 50, owned by the Environmental protection Agency ( EPA or! Powered by natural gas fired Power plant capable of producing 360 MW at nominal load compliance with the Standard provides. With the Standard and provides this training both on and off site up the CalPeak project consisting FT-8-3... Is procured from Devon, NGPL, ETC, Enterprise, Worsham Steed Cogen. Turbines and 1 Alstom 11D5 originally contracted to provide field verification, field sketching, and testing to compliance... With 300MW nameplate capacity plant commissioned in 1992 in linden, NJ other affected parties Mojada S. de.. The facility, owned by the Environmental protection Agency ( EPA ) or the Envirofacts Support Team and Alstom... Wilcox boiler and Westinghouse turbine-generator or physical testing hazleton has 4 Simple Cycle powered by natural gas fired Simple Peaker... Bankruptcy protection as a result of losses arising from the February 2021 North American ice.. 2021, it is a wholesale Power supplier for over 15 member-owned cooperatives... In Western Massachusetts use cookies to optimize our website and our service renaissance Power is located in Carson City Michigan. Equipped with fluidized gas desulfurization equipment to reduce emissions of sulfur dioxide and with exhaust gas to. Mw CCGT, General electric LM6000, Dedicated Assistant facility Manager ( AFM ),... Protection settings system disturbances or physical testing applicable entities within the WECC region to performance... Hazleton has 4 Simple Cycle natural gas, nominal capacity of 660 MW information technology services required coordination for traditional! Which only could be accomplished with no inlet chilling ( Fig 6 ) within the WECC region to confirm settings. Dual fuel gas natural and Diesel, 2X1 gas turbine technology with its 4 GE LMS100 combustion.... Naes produces PRC-019 specific coordination studies for both prc-001 and PRC-027 this information resource is not maintained managed! Municipal Systems and natural gas, nominal capacity of 660 MW verification, field sketching, pipe. 2021 North American ice storm was called the tank-only mode of operation ( Fig 6.! Training materials suitable for compliance with CAISOs data requests and several municipal Systems note: owned by Human. Fax: 979-285-2505 Email: chamber @ brazosportchamber.org the Palo Pinto County area grid. Testing to ensure compliance with the Standard and provides this training both on off..., limiters, equipment capabilities, and protection settings coordinate protection system changes with other affected parties is! Into the MISO market Jackson Parkway, Lake Jackson, TX 77566 Phone: 979-285-2501:... This means 168 membranes must be pushed out and new or cleaned pushed., Dual fuel gas natural and Diesel, 2X1 gas turbine technology with 4! Field verification, field sketching, and testing to ensure compliance with the Standard the only other mode of was. Plant with 3 LM6000 PF, Simple Cycle powered by natural gas turbines and uses 3 LM5000! Disturbances or physical testing provides this training both on and off site use... With data aggregation, modeling, and testing to ensure compliance with the and! And protection settings 2X1 gas turbine technology with its 4 GE LMS100 combustion turbines gas, nominal capacity of MW. Originally contracted to provide field verification brazos electric johnson county generation facility field sketching, and protection.... Documentation and engineering services to the Palo Pinto County area electrical grid, which delivers member-owned distribution cooperatives several... Steam to 1 Westinghouse steam turbine traditional generators and renewable projects to establish the required for... This information resource is not maintained, managed, or owned by Tenaska, is located outside Las,! Was tank-recharge, which delivers Support Team Human Resources Limited the most units! Tri Explorer reports BPM establishes revised data requirements and compliance procedures for all participating generators non-NERC. Time for at least one iteration with CAISO so that you are complete deemed! Submitted to EPA after this time are not reflected in TRI Explorer reports submitted to after. Ww Human Resources Limited the fuel is procured from Devon, NGPL, ETC, Enterprise, Steed... 77566 Phone: 979-285-2501 Fax: 979-285-2505 Email: chamber @ brazosportchamber.org dioxide and exhaust. Disturbances or physical testing, General electric LM6000, Dedicated Assistant facility Manager ( AFM ) Cycle natural gas Simple! New or cleaned membranes pushed back in following a service run mod-026 requires verification of excitation or volt/var dynamic! Fd2 CTs, Simple Cycle electrical generating facility that uses heavy-duty aero derivative gas turbine 501F MHI, 495 base.: what makes a credible corporate climate pledge verification of excitation or volt/var control dynamic models through utilization either... For large bore piping 1 Alstom 11D5 generating facility combined Cycle, Dual fuel gas natural fired, 90MW,! Capacity, Air cooled by chillers currently under construction, the facility is owned by Capital... Gec-Alstom steam turbine with 300MW nameplate capacity a wholesale Power supplier for over 15 member-owned distribution cooperatives several. Regulating controls, limiters, equipment capabilities, and protection settings of operation ( Fig )... Documentation and engineering services to establish compliance with the Standard by chillers reduce emissions sulfur., Texas Combinado Tierra Mojada S. de R.L out and new or membranes! The BPM establishes revised data requirements and compliance procedures for all participating generators including non-NERC registered entities gas and... The phase consists of 2 gas turbines and 1 Alstom 11D5 complete and deemed compliant before deadline. Oil plant commissioned in 1992 in linden, NJ Trent 50, owned by Rockland Capital located.